PROJECT

The design process can take approximately 10-15 days. After approval is obtained, the following steps are taken:

- Placing orders for materials
- Providing single parts (preparing for drilling, cutting)
- Preparing manufacturing drawings
- Preparing assembly drawings

MATERIAL

After the contract is signed:

- A material list is obtained from the 3D model, and orders are placed accordingly.
- Once the ordered materials are procured, they are sent for sandblasting.
- After Sa2.5 sandblasting is completed, a shop primer (15-20 microns) is applied to prevent surface rust, and the materials are sent to the workshop.
- This process typically takes around 10-15 days.

PRELIMINARY

The work program is published to relevant units.

- Plate and profile cutting lists are prepared.

PRODUCTION

According to the lists:

- Procurement of plates and profiles
- Drilling of holes
- Manufacturing of columns, beams, and cross connections in priority order according to the work program.
Solmazlar Group
Solmazlar was established in 2011 and has made a name for itself in the field of steel construction in Istanbul and various regions of Turkey by putting its signature under numerous projects of various sizes. Our company, which always offers innovations in the field of steel construction, successfully completes the work done without leaving any question marks in minds, by delivering the work in accordance with the project, prioritizing customer satisfaction with its quality and reliable service guarantee, and expanding its customer portfolio.
ADDRESS
Mimar Sinan Mah. Bosna Cad. No: 5 D: 6 Çekmeköy / Istanbul
PHONE
+90 530 081 85 34
E MAIL
teklif@solmazlar.com.tr

SOCIAL MEDIA
Solmazlar Group All Rights Reserved © 2024

TR
Production

PROJECT

The design process can take approximately 10-15 days. After approval is obtained, the following steps are taken:

- Placing orders for materials
- Providing single parts (preparing for drilling, cutting)
- Preparing manufacturing drawings
- Preparing assembly drawings

MATERIAL

After the contract is signed:

- A material list is obtained from the 3D model, and orders are placed accordingly.
- Once the ordered materials are procured, they are sent for sandblasting.
- After Sa2.5 sandblasting is completed, a shop primer (15-20 microns) is applied to prevent surface rust, and the materials are sent to the workshop.
- This process typically takes around 10-15 days.

PRELIMINARY

The work program is published to relevant units.

- Plate and profile cutting lists are prepared.

PRODUCTION

According to the lists:

- Procurement of plates and profiles
- Drilling of holes
- Manufacturing of columns, beams, and cross connections in priority order according to the work program.

Solmazlar Group
Solmazlar was established in 2011 and has made a name for itself in the field of steel construction in Istanbul and various regions of Turkey by putting its signature under numerous projects of various sizes. Our company, which always offers innovations in the field of steel construction, successfully completes the work done without leaving any question marks in minds, by delivering the work in accordance with the project, prioritizing customer satisfaction with its quality and reliable service guarantee, and expanding its customer portfolio.
BİZE ULAŞIN
ADDRESS
Mimar Sinan Mah. Bosna Cad. No: 5 D: 6 Çekmeköy / Istanbul
PHONE
+90 530 081 85 34
E MAIL
teklif@solmazlar.com.tr

SOCIAL MEDIA
Solmazlar Group All Rights Reserved © 2024